Electrical Engineering
Collection networks, medium-voltage reticulation, substations, protection, earthing and lightning studies, and grid interface coordination.
Capabilities
Our engineering offering connects project development and design with procurement, construction, commissioning and operational support.
Disciplines
Collection networks, medium-voltage reticulation, substations, protection, earthing and lightning studies, and grid interface coordination.
Module foundations, mounting structure interfaces, access roads, platforms, stormwater drainage and operational buildings.
Auxiliary services, piping, cleaning and water systems, lifting arrangements and plant mechanical installations.
Substation, control room, inverter and battery room cooling and ventilation, drawing on Dinga's established HVAC and refrigeration base.
SCADA architecture, plant controllers, metering, communications infrastructure and monitoring of plant performance.
Procurement support, construction management, commissioning coordination, completion records and handover.
How we engage
Discipline-specific design, studies, reviews or technical documentation within an agreed scope boundary.
Integrated design and delivery of the electrical, civil and auxiliary infrastructure around the generating facility.
Technical representation for developers, IPPs and asset owners across design review, procurement and construction oversight.
Coordinated multidisciplinary execution with documented quality, inspection and commissioning control.
Plant assessments, defect resolution, performance investigations and lifecycle support for operating assets.
Scope of works
Each project's requirements are established with reference to applicable technical standards, network requirements, environmental conditions and equipment manufacturer instructions.
Solar piling
Piled foundations for ground-mounted PV structures, from geotechnical investigation and pile testing to drilling, installation and as-built verification of every position.

Piles transfer wind uplift, dead and lateral loads into competent ground. The method is selected per zone from geotechnical data, accounting for sand, clay, calcrete and rock.
Trial pits, boreholes, DCP tests and soil chemistry.
Pull-out, lateral and compression tests set embedment.
GPS set-out, with rigs sequenced alongside earthworks.
Position, plumb, height and embedment recorded as-built.